SWRO II

Croon Caribe has been awarded the contract for the Electrical and Instrumentation works of the second phase of the Sea Water reverse Osmosis plant (SWRO II) at the Water en Energiebedrijf WEB on Aruba. The second phase consists of a reverse osmosis plant that will produce 24.000 m3 of drinking water for the island of Aruba. Croon Caribe is responsible for the electrical, instrumentation and medium voltage works on this Veolia design/build project that needs to be fully operational early 2012.

Share project