Aeropuerto Intl’ Reina Beatrix
The airport was renamed Dakota Airport Aeropuerto Internacional Reina Beatrix and the runways were extended to make room for the turboprop and jet aircraft. When Aruba Airport Authorities decided to expand and renovate the aiport, Croon was contracted by the main contractor Albo Calmaquip JV for the electrical installations. Croon was responsible for the the fire alarm, FID/BIDS system and the generators.
Owner | Aruba Airport Authorities |
Construction management | Parsons |
Main contractor | Albo Calmaquip JV |
Engineer | Birk Hillman |
Contract sum | Afl .8.500.000,- |