Workers next to WEB's New Water Treatment Plant

WEB's New Water Treatment Plant Receives Complete Electrical Installation

A reliable drinking water supply is essential to Aruba's future. With the commissioning of WEB Aruba's new water treatment facility, an important step has been taken in strengthening the island's water security and production capacity.

Croon Caribe is proud to have delivered the complete electrical installation for this major infrastructure project, deploying a dedicated team of more than 25 professionals.

The new facility is designed to produce at least 16,500 cubic meters of high-quality drinking water per day (approximately 4.4 million gallons). Its advanced treatment processes rely on dependable electrical systems and infrastructure to ensure safe, efficient and continuous operation.

From the execution of the electrical works to the integration of the facility's technical infrastructure, Croon Caribe contributed to bringing this essential installation into operation.

We are proud to have played a key role in a project that strengthens Aruba's drinking water supply and contributes to the island's long-term resilience.

Share news